Skip to content
VELUPAKIndustries

FACTORY / BANG PA-IN PLANT

DOC VP-FAC · BANG PA-IN

Factory & production lines

One plant that forms bagasse, plastics and paper — so you can mix categories in one container without a middleman.

sq m plant area
32,000
employees
260
pieces per day
3.2M
sq m clean packing zone
1,800

F1 / PRODUCTION LINES

14 production lines

Daily capacity based on 2 shifts of 11 hours for standard items.

Machine typeLinesCapacity / day (pcs)Output
Thermoforming (sheet forming)61,450,000Clear rPET, PP containers, all lids
Pulp molding (bagasse)4620,000Bagasse clamshells, plates, bowls
Paper cup & box forming2780,000Hot/cold cups, double-wall cups, kraft boxes
Injection molding (cutlery)2350,000CPLA cutlery, cup lids
Total143,200,000

F2 / PROCESS FLOW

Production process

Every step is logged in our MES and tied to the lot code printed on each carton.

  1. P1

    Raw material intake

    Baled bagasse from central-region sugar mills, rPET/PP sheet and food-grade paperboard pass incoming checks.

    IQC

  2. P2

    Forming

    Heated and injection moulds with automated temperature and pressure control, logged every shift.

    Hourly IPQC

  3. P3

    Trimming & printing

    Die-cut trimming with trim recycled back into the process; flexo/offset printing with food-safe inks.

    Colour vs. master

  4. P4

    Clean-zone packing

    Counted and packed in a dust- and pest-controlled room; staff pass hand-wash and air-curtain stations.

    FQC AQL 2.5

  5. P5

    Warehouse & loading

    6,000-pallet warehouse with 4 loading docks; every container photographed before sealing.

    Pre-shipment

F3 / CLEAN ZONE

1,800 sq m clean packing zone

Food-contact items are packed in a controlled room separated from the forming halls.

  • Positive air pressure, filtration and weekly particle counts
  • Air curtains, hand-wash stations and full gowning for all staff
  • Pest control by an external contractor, audited monthly
  • Glass & brittle-materials policy throughout the zone

F4 / GALLERY

Forming lines, raw material and the export warehouse.

Thermoforming line forming clear plastic containers
FIG. 02Thermoforming line forming clear plastic containers
Pulp-molding press forming natural white bagasse clamshells
FIG. 03Pulp-molding press forming natural white bagasse clamshells
Baled sugarcane bagasse pulp before processing
FIG. 04Baled sugarcane bagasse pulp before processing
Warehouse of palletised packaging cartons ready for container loading
FIG. 05Warehouse of palletised packaging cartons ready for container loading

F5 / OEM & CUSTOM MOULD

OEM and custom moulds

Send 2D/3D drawings or a physical sample. Our engineers design the mould and make prototypes for you to test before mass production.

MOULD COST
USD 2,800–9,500
Mould cost approx. USD 2,800–9,500 per set, depending on size and cavity count
TOOLING TIME
25–40 d
Mould build 25–40 days, including trial runs
Standard lead times
Job typeDays
Standard items, unprinted15–20
Standard items, logo printed20–30
Embossed logo on bagasse (new insert)25–30
New mould set + first production lot45–60

RFQ → PI → PRODUCTION → LOADING

Ready to price your first container?

Add items to your RFQ, set quantities, destination and Incoterm — our sales desk replies with a PI within 1 working day.